Electric   🇨🇴 Colombia · CIF landed

NIO ES8 Export Price to Colombia — CIF Landed 2026

Full landed-cost breakdown for shipping the NIO ES8 from China to Colombia, plus duty, incentives and lead time.

Answer: a NIO ES8 lands in Colombia at roughly $68,338 CIF — FOB $58,892 + freight $1,700 + insurance $667 + import duty $3,063 + clearance $4,016. Indicative for 2026.
NIO ES8 export to Colombia — China EV for export
⚡ 635-655 km CLTC 🔋 102 kWh ✅ Importable to Colombia 🚢 35–50 days

The NIO ES8 is a China-origin, left-hand-drive ev well suited to Colombia. Colombia offers: Lower tariff/VAT and tax perks for EVs.. Import duty context: Colombia offers reduced tariff and VAT incentives for electric vehicles. We supply the unit, prepare export documents and ship to your nearest port.

FOB China$58,892
Ocean freight$1,700
Marine insurance$667
Import duty (est.)$3,063
Port & clearance$4,016
Estimated landed cost (CIF)$68,338
Indicative for 2026 · confirm exact quote on WhatsApp

Prefer chat? Message us on WhatsApp

Cost composition

Where the $68,338 goes

Every component of the CIF landed cost of a NIO ES8 to Colombia.

$68,338CIF landed
  • FOB China$58,892 · 86%
  • Ocean freight$1,700 · 2%
  • Insurance$667 · 1%
  • Import duty$3,063 · 4%
  • Port & clearance$4,016 · 6%

NIO ES8 to Colombia — FAQ

How much is a NIO ES8 landed in Colombia?
Estimated CIF landed cost is about $68,338 — FOB $58,892 + freight $1,700 + insurance $667 + import duty $3,063 + clearance $4,016. Indicative 2026; confirm on WhatsApp.
How long is shipping from China to Colombia?
Typical lead time is 35–50 days.
Is the NIO ES8 compliant for import to Colombia?
Yes — the NIO ES8 can be imported to Colombia as a China-origin LHD unit. We handle export documents.

About the NIO ES8

The NIO ES8 is a flagship electric SUV built on the advanced NT3.0 900V platform. It features dual-motor AWD with a combined 520 kW (700 Nm) and a 102 kWh NMC battery, delivering up to 655 km of CLTC range. The ES8 offers flexible 6 or 7 seat configurations, making it ideal for families. Battery swap capability allows a full 'refuel' in about 3 minutes. As an export unit it is supplied left-hand drive, China-origin, with full documentation and transparent CIF landed pricing to your port.

Battery & charging

Supports DC fast charging; battery swap in ~3 minutes.

Shipping & clearance to Colombia

Colombia offers reduced tariff and VAT incentives for electric vehicles.

Age rule: No age limit for new cars.

Main ports: Cartagena, Buenaventura

Lead time: 35–50 days

Full Colombia import guide →

Ready to import your first EV?

Tell us the model and destination — a full CIF landed quote back within 24 hours.

Request a landed quote →
China-OriginLeft-hand driveCIF to your portExport docs handledRoRo & container
WhatsApp
ChinEV Export · Chat
Reply within minutes · WhatsApp +86 155 5692 0288
Prefer WhatsApp? Tap here →